Services

Construction

  • Install aboveground tanks
  • Install Underground tanks
  • EVR upgrades
  • General Repairs
  • Service P.O.S systems by Gilbarco
  • Pipe Replacements
  • Underground and aboveground tank removal

Testing

    Annual Environmental Health Monitoring System Certification

  • Monitoring System Certification
  • Monitoring System Certification VPH
  • Leak Detector Testing
  • Spill/Fill/ Vapor containment bucket testing
    Annual Air Quality Vapor Testing

  • Healy Static Pressure Decay
  • Healy CAS tank decay
  • Vac line integrity
  • V/L Ratio test
  • Phase 1 Rotatable adapters and drop tube
  • Hirt Burner
  • Balance Static Pressure Decay
  • Liquid Removal VST test
  • Dynamic back pressure
  • Veeder-Root Canister Exhibit 11&12
  • Flow Meter Verification
  • Pressure Sensor Certification
    3 Year Environmental Health Compliance Testing

  • Annular Space test
  • Secondary Piping Test
  • STP Sump test
  • UDC Containment test
  • Fill Sump Containment test
  • Spill/Fill/ Vapor containment
  • Bravo Box Test

We Service

  • Gilbarco
  • Wayne
  • Veeder-Root
  • Healy
  • Incon
  • Red Jacket
  • OPW
  • VST
  • Hirt
  • Hasstech
  • APT piping

Designated Operator

    Performed monthly U.S.T. designated operator site inspection for november 2017. Clean all spill buckets; Inspect under dispenser containment boxes; Inspect vapor recovery equipment; Complete U.S.T. checklist. Run alarm history.

WHAT MAKES
US SPECIAL ?

100+

Sucessful Projects

100%

Satisfied Clients